Project: Distributed Energy Storage Project of China Electric Power Research Institute
Application: Peak shifting
Date: Nov., 2017
Location: Suzhou, Jiangsu
Installed capacity: 3kW/5kW (11 sets)
Introduction: Aiming at after-meter side distributed energy storage facilities characterized by mobility, randomness and decentralization, the project realized the functions as instant access, automatic authentication, plug-and-play, and makes profits by peak shifting, significantly saved eletricity cost.